Pregelatinized Starch Fluid Loss Reducer
+
  • Pregelatinized Starch Fluid Loss Reducer

During the drilling process,due to the effect of pressure difference,the water in the drilling fluid will inevitably filter through the well wall into the ormation,causing the drilling fluid to lose water.This series of products is added to the drilling fluid to make the clay particles adhere to the well wall to form a "filter cake",which not only prevents the further loss of water in the 
drilling fluid,but also protects the well wall.It is an important mud treatment agent to stabilize the well wall and ensure the regularity of the well diameter.

 

■ Technical Data:

Item Parameter
Suspension Viscometer Reading at 600r/min 40g/L Brine ≤18
Saturated brine ≤20
Filtrate Loss (mL) 40g/L Brine ≤10
Saturated Brine ≤10
Screening Residue (2000μm) None

 

■ Package and Storage:

1.This product is packed in lined kraft paper bags,with a net weight of 25±0.2Kg.
2.The product should be lifted and placed gently during transportation,and should be protected from impact,exposure to the sun and rain,and should not be mixed with food.
3.The product should be stored in a cool and ventilated place,away from heat and fire sources.
4.The quality guarantee period is 12 months.

Download

Pregelatinized Starch Fluid Loss Reducer
+
  • Pregelatinized Starch Fluid Loss Reducer

Pregelatinized Starch Fluid Loss Reducer

During the drilling process,due to the effect of pressure difference,the water in the drilling fluid will inevitably filter through the well wall into the ormation,causing the drilling fluid to lose water.


Sample Trial Application Form

Please leave your contact information and we will get back to you as soon as possible

Submit

Enter the information to obtain the materials

Please leave your contact information and we will get back to you as soon as possible

Submit
%{tishi_zhanwei}%